Recovery tow-link (RTL)

The Loadquip recovery tow-link (RTL) is engineered to enable the safe and efficient towing of disabled mining trucks. Designs available for virtually all mining trucks from Caterpillar, Komatsu, Hitachi, Liebherr, and others. It installs in under 20 minutes, generally with no modifications required to the towing or towed vehicle.

Key features

  • Easy installation make it deployable at short notice
  • Consists of three main elements: Draw-Bar, Axle Beam, and Bumper Beam. Each connects via simple pin-mounts. Users with mixed fleets can carry multiple Bumper Beams but use the same Draw-Bar and Axle Beam to cover different trucks
  • No permanent changes required to either towing or towed vehicles in most cases
  • Disabled vehicles must have functional steering and braking. Power for those systems can be supplied via a “buddy” truck or an auxiliary power unit provided by Loadquip

Applications

  • Towing disabled mining trucks back to maintenance or workshop facilities
  • Mixed-fleet operations where several truck models are used, enabling shared components and simplified logistics
  • Situations requiring fast recovery with minimal equipment or crew
  • Scenarios where downtime is costly and restoring mobility is critical

Recovery tow link selection guide

Compare our industry-leading recovery systems to find the perfect fit for your fleet by using the recovery tow link selection guide: