Chute change out – scissor lift (ProLift)
Train load-out chutes at iron ore operations require periodic removal for maintenance and wear-package replacement.
Traditionally, this process took teams several hours using chain blocks and manual rigging. Loadquip delivered the ProLift: a self-propelled, rail-mounted scissor lift system that mechanises the entire chute change-out process. The ProLift supports, lowers, transports, and re-installs chutes with precision, reducing the change-out time from approximately 24 hours down to 4 hours.
The system is container-sized for easy transport (standard 20′ base dimensions), and integrates a dedicated transport frame, hydraulic actuation, and precision alignment capabilities.
Key features
- ProLift can raise a replacement chute in about 10 minutes, drastically reducing maintenance downtime
- The upper platform supports translation in left/right shift, yaw, roll, and pitch rotation to precisely align to the chute bolt flange
- Powered by a diesel engine, all motions (raise, lower, propel, alignment) are hydraulically driven. The operator uses a wireless remote (CANopen) to control the system
- The PLC controls speed modes (creep & normal), enforces pressure limits at fixed heights, monitors system integrity and provides diagnostic reporting
- It alleviates most manual effort in chute removal and installation, enhancing safety
- Its standard container dimensions make it transportable on side-loading trailers, facilitating deployment to remote sites
Applications
- Train load-out systems in iron ore mines, where chutes require periodic removal for maintenance or wear component replacement
- Operations seeking to reduce downtime and safety risk during chute change-outs
- Sites where access constraints or manual rigging hazards make conventional methods inefficient or unsafe
- Environments requiring precise flange alignment to bolt patterns in the load-out structure under strict tolerances