Time lapse video showing assembly of new 450t swing wheel low loader

Assembly of 450t Swing Wheel Low Loader

In this clip you can watch our latest 450 tonne swing wheel loader be re-assembled after being transported to site in three main subassemblies. It also includes the connection of the prime mover to the trailer for the first time. Throughout the sequence you might notice the swing wheel mechanism being tested along with the main trailer jacks being used to raise and lower the deck.


Huge congratulations and thanks to everyone in the team at Loadquip, and our supporting partners, for their enormous efforts in making the process go smoothly.

Leave a Comment

Your email address will not be published. Required fields are marked *